Light obstruction notice
Rights to light refer to rights to receive sufficient light through an opening (such as a window), allowing ordinary comfortable use and enjoyment of a dwelling, or ordinary beneficial use and occupation of other buildings. Generally, rights to light are acquired by prescription where the light has been enjoyed for 20 years.
Rights to light can become an issue when a new development, or proposed development affect the access to light of an adjoining property. Rights to light also apply to obstructions caused by trees, hedges and so on, but there are no rights to light for open ground.
Rights to light are attached to the land and so can perpetuate even if a new building is constructed. It cannot be assumed that no rights to light exist simply because neighbouring buildings appear to be new.
Rights to light by prescription may be lost if an infringement is submitted to for a year without making a claim.
See Rights to light for more information.
It is possible to prevent rights to light being acquired by creating a continuous obstruction to the light for 12 months, starting before 19 years enjoyment of the light has accumulated. However there is obviously considerable risk to doing this.
Alternatively, Light Obstruction Notices (LON) can be registered under the Rights of Light Act 1959, even where no obstruction has actually been created yet. If the notice is not challenged within a year the notional infringement of the enjoyment of the light can be considered to have been accepted, the rights defeated, and the 20-year clock ‘reset’.
Notice of LON’s must be given to affected parties in a way determined by the Lands Tribunal and LON’s must be registered with the local authority on the Local Land Charges Register. Applications for registration should include:
- An application form.
- A plan showing the location of the property enjoying the light and the proposed obstruction.
- A Lands Tribunal certificate confirming that appropriate notices have been given to affected parties.
If the LON remains valid for a year, then any accruing rights are defeated.
LONs can be challenged if an affected party can demonstrate that they have had enjoyment of the light for 20 years. They can either be challenged or negotiated directly with the applicant, or challenged through the courts, and this may result in cancelling or altering the notice.
LON's are a relatively inexpensive way of defeating rights, and can be used even if it is only suspected that there may be rights, simply to identify potential claims.
If the applicant can demonstrated to the Lands Tribunal that the application is urgent, an expedited process may be adopted, and a temporary certificate given, which is followed later by the definitive certificate.
[edit] Related articles on Designing Buildings Wiki
- Adequate view out.
- BREEAM Reduction of night time light pollution.
- Easements.
- Light pollution.
- Lighting of construction sites.
- Nuisance.
- Openable window area.
- Restrictive covenants.
- Right of support.
- Rights of way.
- Right to a view.
- Rights to light.
- Tree rights.
- Value in the view: conserving historic urban views.
Featured articles and news
Sustainable Urban Drainage and Biodiversity
Awards for champions of these interconnected fields now open.
Microcosm of biodiversity in balconies and containers
How minor design adaptations for considerable biodiversity benefit.
CIOB student competitive construction challenge Ireland
Inspiring a new wave of Irish construction professionals.
Challenges of the net zero transition in Scotland
Skills shortage and ageing workforce hampering Scottish transition to net zero.
Private rental sector, living standards and fuel poverty
Report from the NRH in partnership with Impact on Urban Health.
.Cold chain condensing units market update
Tracking the evolution of commercial refrigeration unit markets.
Attending a conservation training course, personal account
The benefits of further learning for professsionals.
Restoring Alexander Pope's grotto
The only surviving part of his villa in Twickenham.
International Women's Day 8 March, 2025
Accelerating Action for For ALL Women and Girls: Rights. Equality. Empowerment.
Lack of construction careers advice threatens housing targets
CIOB warning on Government plans to accelerate housebuilding and development.
Shelter from the storm in Ukraine
Ukraine’s architects paving the path to recovery.
BSRIA market intelligence division key appointment
Lisa Wiltshire to lead rapidly growing Market Intelligence division.
A blueprint for construction’s sustainability efforts
Practical steps to achieve the United Nations Sustainable Development Goals.
Timber in Construction Roadmap
Ambitious plans from the Government to increase the use of timber in construction.
ECA digital series unveils road to net-zero.
Retrofit and Decarbonisation framework N9 launched
Aligned with LHCPG social value strategy and the Gold Standard.
Competence framework for sustainability
In the built environment launched by CIC and the Edge.
Institute of Roofing members welcomed into CIOB
IoR members transition to CIOB membership based on individual expertise and qualifications.
Join the Building Safety Linkedin group to stay up-to-date and join the debate.
Government responds to the final Grenfell Inquiry report
A with a brief summary with reactions to their response.